Author Topic: NASA hopes to launch 'flying saucer' after delay  (Read 701 times)

0 Members and 1 Guest are viewing this topic.

Online Buster's Uncle

  • Geo's kind, I unwind, HE'S the
  • Planetary Overmind
  • *
  • Posts: 50907
  • €162
  • View Inventory
  • Send /Gift
  • Because there are times when people just need a cute puppy  Soft kitty, warm kitty, little ball of fur  A WONDERFUL concept, Unity - & a 1-way trip that cost 400 trillion & 40 yrs.  
  • AC2 is my instrument, my heart, as I play my song.
  • Planet tales writer Smilie Artist Custom Faction Modder AC2 Wiki contributor Downloads Contributor
    • View Profile
    • My Custom Factions
    • Awards
NASA hopes to launch 'flying saucer' after delay
« on: June 13, 2014, 03:45:44 am »
NASA hopes to launch 'flying saucer' after delay
Associated Press
By ALICIA CHANG  3 hours ago



FILE - In this undated file photo provided by NASA, a saucer-shaped test vehicle known as a Low Density Supersonic Decelerator holding equipment for landing large payloads on Mars is shown in the Missile Assembly Building at the US Navy's Pacific Missile Range Facility at Kekaha on the island of Kauai in Hawaii. The U.S. space agency is deciding its next move after it lost the chance to launch the vehicle into the Earth’s atmosphere because of unfavorable wind conditions. The mission is designed to test technology that could be used on Mars.



LOS ANGELES (AP) — NASA hopes to try again to launch a "flying saucer" into Earth's atmosphere to test Mars mission technology after losing the chance because of bad weather, project managers said Thursday.

The space agency is working with the U.S. Navy on the Hawaiian island of Kauai to see if it can get the experimental flight off the ground in late June.

During the current two-week launch window, the team came "tantalizingly close," but winds spoiled every opportunity, said project manager Mark Adler of the NASA Jet Propulsion Laboratory.

Winds must be calm for a helium balloon to carry the disc-shaped vehicle over the Pacific so it doesn't stray into no-fly zones.

"We're ready to go. We're not giving up," Adler said.

NASA has invested $150 million in the project so far, and extending the launch window would come with some cost. If the flight doesn't happen this summer, it would be postponed until next year.



In this undated photo provided by NASA, an engineer works on the Parachute Deployment Device of the Low Density Supersonic Decelerator (LDSD) test vehicle in this image taken at the Missile Assembly Building at the US Navy's Pacific Missile Range Facility at Kekaha on the island of Kaua‘i in Hawaii. From high altitudes above Earth, the vehicle will test two devices for landing future heavy payloads on Mars. The U.S. space agency is deciding its next move after it lost the chance to launch the vehicle into the Earth’s atmosphere because of unfavorable wind conditions. The mission is designed to test technology that could be used on Mars. (AP Photo/NASA)


The mission is designed to test a new supersonic vehicle and giant parachute in Earth's stratosphere where conditions are similar to the red planet.

For decades, NASA relied on the same parachute design to slow spacecraft streaking through the thin Martian atmosphere. The 1-ton Curiosity rover that landed in 2012 used the same basic parachute as the twin Viking landers in 1976.

With plans to land heavier payloads and eventually astronauts, NASA needed to develop new drag devices and a stronger parachute.

Measuring 110 feet in diameter, the new parachute is twice as large as the one that carried Curiosity. Since it can't fit in a wind tunnel where NASA does its traditional testing, engineers looked toward the skies off Kauai.

NASA had rigged the test vehicle with several GoPro cameras with the hope that viewers would follow the action live online.

Project scientist Ian Clark called the weather delay "hardly even a hiccup" in the long road to landing spacecraft on Earth's planetary neighbor.

"We're still very enthusiastic," Clark said. "We're still very optimistic about the opportunities that we think we'll have in front of us to do this test."


http://news.yahoo.com/nasa-hopes-launch-flying-saucer-delay-192336752.html

 

* User

Welcome, Guest. Please login or register.
Did you miss your activation email?


Login with username, password and session length

Select language:

* Community poll

SMAC v.4 SMAX v.2 (or previous versions)
-=-
24 (7%)
XP Compatibility patch
-=-
9 (2%)
Gog version for Windows
-=-
105 (33%)
Scient (unofficial) patch
-=-
40 (12%)
Kyrub's latest patch
-=-
14 (4%)
Yitzi's latest patch
-=-
89 (28%)
AC for Mac
-=-
3 (0%)
AC for Linux
-=-
5 (1%)
Gog version for Mac
-=-
10 (3%)
No patch
-=-
16 (5%)
Total Members Voted: 315
AC2 Wiki Logo
-click pic for wik-

* Random quote

Observe the Razorbeak as it tends so carefully to the fungal blooms.. just the right bit from the yellow, then a swatch from the pink. Follow the Glow Mites as they gather and organize the fallen spores. What higher order guides their work? Mark my words: someone or something is managing the ecology of this planet.
~Lady Deirdre Skye 'Planet Dreams'

* Select your theme

*
Templates: 5: index (default), PortaMx/Mainindex (default), PortaMx/Frames (default), Display (default), GenericControls (default).
Sub templates: 8: init, html_above, body_above, portamx_above, main, portamx_below, body_below, html_below.
Language files: 4: index+Modifications.english (default), TopicRating/.english (default), PortaMx/PortaMx.english (default), OharaYTEmbed.english (default).
Style sheets: 0: .
Files included: 45 - 1228KB. (show)
Queries used: 35.

[Show Queries]