Author Topic: Private Space Taxis for Astronauts Move Closer to First Test Flights  (Read 652 times)

0 Members and 1 Guest are viewing this topic.

Online Buster's Uncle

  • Geo's kind, I unwind, HE'S the
  • Planetary Overmind
  • *
  • Posts: 50907
  • €162
  • View Inventory
  • Send /Gift
  • Because there are times when people just need a cute puppy  Soft kitty, warm kitty, little ball of fur  A WONDERFUL concept, Unity - & a 1-way trip that cost 400 trillion & 40 yrs.  
  • AC2 is my instrument, my heart, as I play my song.
  • Planet tales writer Smilie Artist Custom Faction Modder AC2 Wiki contributor Downloads Contributor
    • View Profile
    • My Custom Factions
    • Awards
Private Space Taxis for Astronauts Move Closer to First Test Flights
SPACE.com
by Elizabeth Howell, SPACE.com Contributor  15 hours ago



Boeing's new model of the CST-100 spacecraft as seen at the company's Houston Product Support Center in Texas.



NASA's plan to start launching its astronauts into space from American soil again has achieved another milestone.

The three American aerospace companies competing to build astronaut taxis for NASA have completed the first stage of flight certification under the agency's commercial crew program, officials announced on Friday (May 30).

"This certification is important to ensuring our crew members have reliable transportation to and from the space station, where they are conducting research essential to advancing human exploration farther into the solar system," Phil McAlister, director of commercial spaceflight at NASA headquarters, said in a statement.

The news came less than a day after SpaceX unveiled the design for its seven-person manned Dragon spacecraft at its headquarters in Hawthorne, Calif. (The other two companies to receive funding in the latest round of commercial crew awards are Boeing and Sierra Nevada Corp., which are designing a capsule called the CST-100 and a space plane called Dream Chaser, respectively.)

All manned flights to the International Space Station today utilize Russia's Soyuz spacecraft, which costs NASA about $70 million per seat. This situation has been in place since the agency's space shuttle fleet retired in 2011. NASA hopes to have at least one commercial crew vehicle ready to ferry astronauts by 2017.



An artistic rendition of the Dream Chaser vehicle launching into space.


All three companies — currently working under contracts collectively worth $30 million that were awarded in 2012 — spoke with NASA officials about how they plan to bring people to and from the space station. The reviews included discussions of safety requirements and how to meet NASA performance standards officials said.

"It's allowed them to mature their plans and gave us additional insight into each company’s approach," said Ed Burns, systems engineering and integration acting manager for the Commercial Crew Program. "It also gave our NASA team and the partners a chance to work together towards certifying their systems."

All three companies are now eligible for the next stage of certification, called Commercial Crew Transportation Capability (CctCap). But this also depends on funding, as NASA is waiting to hear how much money will be available for this phase. The agency said it will announce "one or more" CctCap awards later in 2014, depending on what Congress approves.

CctCap will require companies to do at least one crewed flight test each to make sure their spacecraft perform well and can dock to the space station. Once that hurdle is cleared, two to six more missions will be required per company "to enable NASA to meet its station crew rotation requirements," the agency added.

The firms are encouraged to shop their designs around for other purposes outside of NASA, as the agency is hoping that other customers will buy spaceflights from the companies.


http://news.yahoo.com/private-space-taxis-astronauts-move-closer-first-test-101653809.html

 

* User

Welcome, Guest. Please login or register.
Did you miss your activation email?


Login with username, password and session length

Select language:

* Community poll

SMAC v.4 SMAX v.2 (or previous versions)
-=-
24 (7%)
XP Compatibility patch
-=-
9 (2%)
Gog version for Windows
-=-
105 (33%)
Scient (unofficial) patch
-=-
40 (12%)
Kyrub's latest patch
-=-
14 (4%)
Yitzi's latest patch
-=-
89 (28%)
AC for Mac
-=-
3 (0%)
AC for Linux
-=-
5 (1%)
Gog version for Mac
-=-
10 (3%)
No patch
-=-
16 (5%)
Total Members Voted: 315
AC2 Wiki Logo
-click pic for wik-

* Random quote

What actually transpires beneath the veil of an event horizon? Decent people shouldn't think too much about that.
~Academician Prokhor Zakharov 'For I Have Tasted The Fruit'

* Select your theme

*
Templates: 5: index (default), PortaMx/Mainindex (default), PortaMx/Frames (default), Display (default), GenericControls (default).
Sub templates: 8: init, html_above, body_above, portamx_above, main, portamx_below, body_below, html_below.
Language files: 4: index+Modifications.english (default), TopicRating/.english (default), PortaMx/PortaMx.english (default), OharaYTEmbed.english (default).
Style sheets: 0: .
Files included: 45 - 1228KB. (show)
Queries used: 35.

[Show Queries]