Author Topic: Lockheed Martin begins $350 million satellite facility in Colorado  (Read 345 times)

0 Members and 1 Guest are viewing this topic.

Offline Buster's Uncle

  • Geo's kind, I unwind, HE'S the
  • Planetary Overmind
  • *
  • Posts: 50452
  • €509
  • View Inventory
  • Send /Gift
  • Because there are times when people just need a cute puppy  Soft kitty, warm kitty, little ball of fur  A WONDERFUL concept, Unity - & a 1-way trip that cost 400 trillion & 40 yrs.  
  • AC2 is my instrument, my heart, as I play my song.
  • Planet tales writer Smilie Artist Custom Faction Modder AC2 Wiki contributor Downloads Contributor
    • View Profile
    • My Custom Factions
    • Awards
Lockheed Martin begins building $350 million satellite facility in Jeffco
Denver Business Journal
Greg Avery  and Ben Miller  Aug 2, 2017, 8:04am MDT   Updated Aug 2, 2017, 1:38pm MDT   



Lockheed Martin Corp. has started construction on a new $350 million satellite manufacturing facility at its Waterton Canyon campus in Jefferson County.

Lockheed Martin (NYSE: LMT) said its new 266,000-square-foot Gateway Center satellite plant will be completed in 2020.



Lockheed Martin Corp. said it's started construction on a new $350 million facility that will build satellites at its Waterton Canyon facility in Jefferson County.  Lockheed Martin rendering


The new facility is part of the ongoing transformation and expansion of the foothills campus, which is the headquarters of aerospace and defense company's Lockheed Martin Space Systems Co. (LMSS) division.

Construction is expected to employ a total of 1,500 contractors over the course of three years, the company said.

LMSS has added more than 750 local jobs since 2014, and it currently has about 350 job openings.

The new building will accommodate that recent growth and new future projects, the company said.

"This is our factory of the future: agile, efficient and packed with innovations. We'll be able to build satellites that communicate with front-line troops, explore other planets, and support unique missions," said Rick Ambrose, executive vice president of LMSS, in a statement. "You could fit the Space Shuttle in the high bay with room to spare. That kind of size and versatility means we'll be able to maximize economies of scale, and with all of our test chambers under one roof, we can streamline and speed production."

The company has other clean rooms and satellite production facilities on the campus, but they're all typically being used, LMSS spokesman Matt Kramer said. The company is in the midst of building four large global positioning satellites for the U.S. Air Force, weather satellites, and NASA's Insight lander that's scheduled to launch on a mission to Mars next year.
 
Adding another large satellite cleanroom and production facility will let the company quickly start on future commercial or federal government satellite projects it expects, Kramer said.

The new plant is designed to use 3-D printing, digital design and virtual reality to make satellite construction more efficient.

The Gateway Center clean room will fit five large-scale satellites being built simultaneously. It's also designed to be flexible enough for use in manufacturing small satellites, too, the company said.


https://www.bizjournals.com/denver/news/2017/08/02/lockheed-martin-begins-building-350-million.html?ana=yahoo&yptr=yahoo

 

* User

Welcome, Guest. Please login or register.

Login with username, password and session length

Select language:

* Community poll

SMAC v.4 SMAX v.2 (or previous versions)
-=-
24 (7%)
XP Compatibility patch
-=-
9 (2%)
Gog version for Windows
-=-
105 (33%)
Scient (unofficial) patch
-=-
40 (12%)
Kyrub's latest patch
-=-
14 (4%)
Yitzi's latest patch
-=-
89 (28%)
AC for Mac
-=-
3 (0%)
AC for Linux
-=-
6 (1%)
Gog version for Mac
-=-
10 (3%)
No patch
-=-
16 (5%)
Total Members Voted: 316
AC2 Wiki Logo
-click pic for wik-

* Random quote

And when at last it is time for the transition from megacorporation to planetary government, from entrepreneur to emperor, it is then that the true genius of our strategy shall become apparent, for energy is the lifeblood of this society and when the chips are down he who controls the energy supply controls Planet. In former times the energy monopoly was called 'The Power Company', we intend to give this name an entirely new meaning.
~CEO Nwabudike Morgan 'The Centauri Monopoly'

* Select your theme

*
Templates: 5: index (default), PortaMx/Mainindex (default), PortaMx/Frames (default), Display (default), GenericControls (default).
Sub templates: 8: init, html_above, body_above, portamx_above, main, portamx_below, body_below, html_below.
Language files: 4: index+Modifications.english (default), TopicRating/.english (default), PortaMx/PortaMx.english (default), OharaYTEmbed.english (default).
Style sheets: 0: .
Files included: 45 - 1228KB. (show)
Queries used: 35.

[Show Queries]