Author Topic: NASA's New Space Launch System Mega Rocket Won't Fly Until 2018  (Read 339 times)

0 Members and 1 Guest are viewing this topic.

Offline Buster's Uncle

  • Geo's kind, I unwind, HE'S the
  • Planetary Overmind
  • *
  • Posts: 51056
  • €438
  • View Inventory
  • Send /Gift
  • Because there are times when people just need a cute puppy  Soft kitty, warm kitty, little ball of fur  A WONDERFUL concept, Unity - & a 1-way trip that cost 400 trillion & 40 yrs.  
  • AC2 is my instrument, my heart, as I play my song.
  • Planet tales writer Smilie Artist Custom Faction Modder AC2 Wiki contributor Downloads Contributor
    • View Profile
    • My Custom Factions
    • Awards
NASA's New Space Launch System Mega Rocket Won't Fly Until 2018
« on: December 11, 2014, 01:59:01 am »
NASA's New Space Launch System Mega Rocket Won't Fly Until 2018
SPACE.com
By Miriam Kramer  3 hours ago



This artist's concept depicts NASA’s Space Launch System (SLS) in 70-metric-ton configuration as it lifts off into space.



NASA's new mega rocket will likely not make its first test launch until at least mid-2018, a top agency official told a U.S. lawmakers today (Dec.10).

The space agency's first test flight of the Space Launch System (SLS) was originally targeted for December 2017, however, that test will likely be delayed until at least mid-2018, according to Bill Gerstenmaier, NASA's associate administrator for human exploration and operations. Unexpected delays have pushed back the rocket's first launch, but Gerstenmaier is still confident that SLS will make its first flight before the end of 2018.

"We were holding December of 2017; I would say that we have now moved off of that date," Gerstenmaier told members of the House of Representatives Subcommittee on Space during a hearing today. "We will be somewhere in the 2018 timeframe now with our current planning, and that's just based on the reality of problems that have come along in the program and some uncertainty in funding."

The SLS test launch date is also dependent upon another NASA project in development. The space agency's Orion space capsule — designed to carry four astronauts to deep-space destinations like Mars eventually — will be placed atop the SLS for the uncrewed 2018 test flight, called Exploration Mission-1.

Orion will probably not be ready for the unmanned 2017 launch, either, Gerstenmaier said, but SLS will still likely be ready for launch before the space capsule whenever that may be. However, that isn't necessarily a bad thing.



Bill Gerstenmaier, NASA's associate administrator for human exploration and operations, testifies before Congress on Dec. 10, 2014 about the Space Launch System.


"I think it's perfectly fine to complete one of these programs [Orion or SLS) ahead of one of the others," Gerstenmaier said. "They don't need to all synch up at exactly the same time … When you take a vehicle down to launch at the Kennedy Space Center, typically, the rocket is ready to go well before the payload is, and the payload comes later. It's actually to our advantage to have some difference in schedules between those."

SLS and Orion are designed to take humans deeper into space than ever before. Orion is built to be part of future missions that could bring astronauts to an asteroid and Mars for the first time.

Orion launched to space atop a United Launch Alliance Delta IV Heavy rocket for its first test flight on Dec. 5. The successful mission helped NASA officials test key systems (like the capsule's parachutes and heat shield) before humans ever step foot onboard.

The SLS program is getting ready to start manufacturing pieces of the rocket necessary for flight, Gerstenmaier said.

NASA has a couple of other test missions planned for Orion and SLS in the future. After the first test flight in 2018, Orion and SLS are expected to fly a crewed mission for the first time in 2021. The change in the launch date for Exploration Mission-1 does not necessarily mean that any of the future missions will slip, Gerstenmaier said.

"We're not just building a single system that sprints to a destination," Gerstenmaier added. "We're building an infrastructure that allows us to have sustained presence beyond low-Earth orbit."


http://news.yahoo.com/nasas-space-launch-system-mega-rocket-wont-fly-224840128.html

 

* User

Welcome, Guest. Please login or register.
Did you miss your activation email?


Login with username, password and session length

Select language:

* Community poll

SMAC v.4 SMAX v.2 (or previous versions)
-=-
24 (7%)
XP Compatibility patch
-=-
9 (2%)
Gog version for Windows
-=-
105 (33%)
Scient (unofficial) patch
-=-
40 (12%)
Kyrub's latest patch
-=-
14 (4%)
Yitzi's latest patch
-=-
89 (28%)
AC for Mac
-=-
3 (0%)
AC for Linux
-=-
5 (1%)
Gog version for Mac
-=-
10 (3%)
No patch
-=-
16 (5%)
Total Members Voted: 315
AC2 Wiki Logo
-click pic for wik-

* Random quote

You see in this dome the intermingling of native and earth plants. Outside, they are competitors, struggling over the trace elements required for life. Often, one destroys the other. Here, they are tended with care and kept well nourished. They thrive together, and the native fungus does not unleash its terrible defenses. As you can see, competition is unnecessary when resources are plentiful and population growth is controlled.
~ Lady Deirdre Skye ‘Planet Dreams’

* Select your theme

*
Templates: 5: index (default), PortaMx/Mainindex (default), PortaMx/Frames (default), Display (default), GenericControls (default).
Sub templates: 8: init, html_above, body_above, portamx_above, main, portamx_below, body_below, html_below.
Language files: 4: index+Modifications.english (default), TopicRating/.english (default), PortaMx/PortaMx.english (default), OharaYTEmbed.english (default).
Style sheets: 0: .
Files included: 45 - 1228KB. (show)
Queries used: 34.

[Show Queries]